Shanxi section of Xiong'an-Xinzhou High-speed Railway enters testing phase

(goshanxi.com.cn)

Updated: 2026-11-17

The Xiong'an-Xinzhou High-speed Railway in Shanxi province entered its joint testing and commissioning phase as the test train 55052 departed from Xinzhouxi Railway Station on Nov 15. This phase, scheduled to last 66 days, sets the stage for the line to begin operation by the end of March 2027.

雄忻高铁1_副本.png

Test train 55052 departs from Xinzhouxi Railway Station. [Photo/Shanxi News Network]

The joint testing and commissioning aim to ensure all systems are compatible and meet design and safety standards, laying a solid foundation for subsequent trial operations and the official launch.

Yan Yongping, director of the Science and Technology Information Department at China Railway Taiyuan Bureau Group, explained that the testing will thoroughly evaluate the functionality, performance, and coordination of all systems. It will also assess emergency response capabilities in scenarios involving equipment failures and natural disasters, ensuring the entire line meets the necessary acceptance and opening requirements.

雄忻高铁2_副本.png

Control room staff members monitor the dispatch console. [Photo/Shanxi News Network]

The Xiong'an-Xinzhou High-speed Railway starts at Xiong'an Railway Station in Xiong'an New Area, passes through Baoding in Hebei province, and connects to Xinzhouxi Railway Station in Shanxi. The main line spans approximately 342 kilometers, with the Shanxi section covering about 122 km. 

As a key part of the Beijing-Kunming High-speed Railway, the line's opening will strengthen the Beijing-Tianjin-Hebei rail network, improve travel for residents, and stimulate regional economic and social development.